Consulting Projects

We can help your business take the next step.

  • Date
    1 Ιανουαρίου, 2024
    Simtec simulated the ventilation and cooling of a power generation facility in the Libyan desert, addressing the challenges of excessive solar heat and diesel engine output. Using Fluent's solar load model, the study focused on the worst-case summer scenario. The simulation included realistic geometry and material properties, assessing the HVAC system's capacity to manage heat from three engines. The results showed the system's ability to handle the high heat load, ensuring effective cooling and ventilation.